Project Name: Procurement of Efficient Pipe Chain Conveyor Equipment for the Expansion Project of Yiyang Urban Domestic Waste Incineration Power Plant
Construction unit: Everbright Environmental Protection Energy (Yiyang) Co., Ltd
Processing capacity: The amount of fly ash in Phase I is approximately 24t/d or 32m3 (calculated based on 3% of the waste volume). The amount of fly ash in the second phase is about 18t/d or 24m3 (calculated based on 3% of the waste amount)
Medium properties: Fly ash collected from waste incineration boiler flue gas during flue gas purification system treatment
Treatment process: closed pipe chain transportation